WK Building

Client:

Roselli Family Trust

Project Typology:

New Commercial Build

Date Completed:

2017

Significant Stats:

Three story, precast and steel framed building, with concrete floor with precast panel construction, structural steel support beams and roof frame.

Fire detection and manual alarm system, fire extinguishers.

Two upper floors in one office tenancy, plus two other smaller office tenancies to the ground floor area.

0

Floor Area (m 2)

0

Height (m)

Challenges:

Demolition of the existing warehouse building, which included an asbestos component.

Very confined site, with roads immediately boarding three side of the site, one of which being SH1.


Success:

Completed on time for the landlord and tenants.


Proportion of Resources:

Robinson Construction Ltd coordinated the design and consenting for the project, then delivered the completed turnkey building.

Robinson Construction completed the traditional Concrete, Carpentry and Finishing trades. Subcontractors were engaged for Structural Steel, Roofing, Electrical, Hydraulic, Mechanical, Fire Services, Joinery, Painting and Site works trades.


Key Personnel:

Nick Robinson (Project Manager)

Julian Morris (Site Manager)

Gareth Shawcross (QS)


How Key Personnel Supported Success:

The communication and co-operation between our team and the client and their consultants resulted in great success for all involved.